An accessory dwelling unit is a whole house on somebody else's lot, sold to homeowners who have never built anything. They sign a design agreement, wait out the permit, then sign a construction contract, a payment schedule and a stream of change orders. SignMaster keeps each phase moving with documents they can sign on their own phone, and a sealed record of every approval for when the final payment comes due.

Updated November 9, 2026 · 3 min read

On this page
  1. What each phase of an ADU needs signed
  2. California: building an ADU is home improvement
  3. A payment schedule built from the work
  4. Milestones the homeowner approves
  5. Pricing
  6. What SignMaster doesn't do
  7. Questions

What each phase of an ADU needs signed

PhaseDocuments
Feasibility and designA feasibility or site study agreement, then a design agreement covering plans, engineering, the permit submittal and what the fees pay for
PermittingThe owner's signature on city and utility applications, and any service upgrade request
ConstructionThe home improvement contract, the progress payment schedule, the selections sheet and change orders
Prefab or manufactured unitsThe unit purchase agreement and a separate site work and installation contract
CloseoutFinal inspection sign-off, the punch list, warranty and keys
ADU documents by phase

California: building an ADU is home improvement

“Building an ADU is considered a home improvement project under the Contractors State License Law.”
Contractors State License Board, Fast Facts: Tips for Building a Residential ADU

So the home improvement rules apply. CSLB says a written home improvement contract is required, covering the scope of work, timeline, payment schedule, materials and finishes, your license number and the notice of cancellation rights. Contractors can't ask for or accept a down payment of more than $1,000 or 10 percent of the total contract price, whichever is less, and progress payments must reflect the actual work completed or materials delivered.

CSLB also tells homeowners they have three days from signing to cancel, five if they're 65 or older and seven in disaster zones, to be careful about paying for plans or permits before work starts, and that a B general building contractor can build an ADU while a C-47 can install a manufactured one. Read the California home improvement contract requirements before you finalize your template.

A payment schedule built from the work

CSLB's sample schedule for an ADU splits the price into phases: 5% mobilization, 10% demolition and site prep, 10% foundation, 15% framing, 15% rough MEP, 15% roof and exterior wrap, 10% insulation and drywall, 10% flooring, tile and cabinets, 5% finish MEP and carpentry, 3% final inspection, and 2% at keys, once the punch list is done.

Put your own schedule into the contract template as calculated fields: each phase's percentage times the contract price, so the dollar amounts fill themselves in. Then the homeowner signs one document with the numbers already worked out.

Milestones the homeowner approves

  1. 1

    Finish the phase

    Framing is done and inspected. Scan the signed inspection card in the iPhone and iPad app.

  2. 2

    Send the milestone sign-off

    A one-page form with the phase, the inspection, photos and an Approve field. The homeowner taps Approve from work.

  3. 3

    Invoice against the record

    Your invoice goes out with a sealed approval behind it, and the template's Responses table lists every milestone approved so far.

  4. 4

    Handle changes the same way

    A window upgrade or a utility trench rerouted around a tree becomes a signed change order before the work, as CSLB recommends.

Pricing

ADU builders with a designer, a project manager and an office usually start on Crew: $49 a month for 5 people, plus $8 a month per extra seat. Solo is $15 a month for an owner-operator. Every paid plan sends unlimited envelopes. New workspaces get 14 days of Crew free. Compare plans.

What SignMaster doesn't do

  • It doesn't draw plans, run feasibility studies or file permits.
  • It doesn't take down payments or progress payments.
  • It doesn't decide which notices your state's home improvement law requires.
  • Signing requests go by email; you can copy a link and text it.

Questions? Answers.

Is an ADU contract a home improvement contract in California?

CSLB says building an ADU is a home improvement project under the Contractors State License Law, so a written home improvement contract is required and the down payment and progress payment limits apply.

Can both homeowners sign the construction contract remotely?

Yes. Each signs from an email link on their own phone or computer, in the order you set, and nobody needs an account.

Can the homeowner approve each phase before I invoice it?

Yes. Send a short milestone form with an Approve field. Their approval, name and time are printed on the page and sealed with the certificate.

Can I send the design agreement before the contract?

Yes. Send each phase's documents as their own envelope from a template, so the design agreement is signed long before the construction contract.

Sources

  1. CSLB Fast Facts: Tips for building a residential accessory dwelling unit (ADU) · cslb.ca.gov
  2. CSLB: Important contract and payment rules (home improvement and ADUs) · cslb.ca.gov

Your next contract,
signed today.

Start free in any browser and send your first document.