A punch list is a written list of minor items that still need fixing or finishing when a construction job is nearly done: a scratched panel, a missing outlet cover, a door that sticks. It's usually made at a walk-through once the work is substantially complete.

Updated November 9, 2026 · 1 min read

On this page
  1. Why it matters
  2. How to run one
  3. An example
  4. In SignMaster

Why it matters

It draws a line under the job. Everything on the list gets fixed; anything raised later is either warranty work or a new request. Many contracts hold back part of the final payment until the list is finished, which keeps both sides moving.

How to run one

  1. Walk the job with the customer, room by room.
  2. Write each item specifically: where it is and what done looks like.
  3. Agree a date to finish the list and any amount held back until then.
  4. Have the customer sign the list, then sign off again when it's done.

An example

At the end of a kitchen remodel the homeowner and contractor list five items: realign two cabinet doors, caulk the backsplash edge, replace a dented dishwasher panel, add a switch plate, touch up paint by the window. The contractor finishes them within ten days and collects the holdback.