How long should you keep signed contracts?
Keep a signed contract for as long as it's in force, plus the time someone could sue over it, plus any longer period a tax, payroll or industry rule sets. For a written contract, the deadline to sue runs from about five to ten years depending on the state, and the clock usually starts when the contract is broken, not when it's signed. So a two-year service agreement can matter for eight years or more. Here's how to work out the number, with the rules that set it.
Updated November 9, 2026 · 5 min read
On this page
The short answer
- Contract life plus the limitation period. Keep it while it's in effect, then for your state's deadline to sue on a written contract, counted from the last date anything could have gone wrong.
- Then check the other clocks. Tax records, payroll records, lease disclosures and construction claims each have their own, and the longest one wins.
- Keep the whole package. The signed copy, every amendment and change order, and the record of who signed and when.
- Electronic copies count. A digital record meets a legal duty to keep a contract if it's accurate and can be reproduced later.
The deadline to sue: statutes of limitation
Every state sets how long someone has to file a lawsuit over a broken contract. Written contracts often get more time than spoken ones, and the period generally runs from when the claim accrues, which for a contract usually means the breach. Some examples, from each state's own code:
| State | Deadline | Where it's written |
|---|---|---|
| Florida | 5 years for an action on a contract founded on a written instrument | Fla. Stat. § 95.11(2)(b) |
| New York | 6 years for an action on a contractual obligation | N.Y. CPLR 213(2) |
| Ohio | 6 years after the cause of action accrued, for a written contract | Ohio Rev. Code § 2305.06 |
| Washington | 6 years for an action on a written contract | RCW 4.16.040(1) |
| Arizona | 6 years for a debt founded on a written contract executed in Arizona | Ariz. Rev. Stat. § 12-548(A) |
| Rhode Island | 10 years, the general limit for civil actions | R.I. Gen. Laws § 9-1-13(a) |
Sales of goods follow a separate Uniform Commercial Code rule. Ohio's version is typical: an action for breach of a contract for sale must be brought within four years, and the parties can agree to shorten that to no less than one year but can't extend it (Ohio Rev. Code § 1302.98(A)). New York's six-year rule lists the same UCC article as an exception.
Construction work can matter for a decade
For contractors, the contract is evidence in defect claims long after the final invoice. Many states also have a statute of repose, an outer limit counted from when the work was finished:
- Ohio cuts off injury and property-damage claims arising from a defective and unsafe condition of an improvement to real property, against those who designed or built it, ten years after substantial completion, unless a longer express warranty applies (Ohio Rev. Code § 2305.131).
- Washington requires construction claims to accrue within six years after substantial completion or the end of the contractor's services, whichever is later; the ordinary limitation period then runs from there (RCW 4.16.310).
In principle, that lets a contract claim over a Washington job surface more than a decade after the crew left. Keep each job's contract, change orders, lien waivers, warranty and completion sign-off together, at least through your state's repose period.
Tax records: the IRS clocks
Contracts that back up income, expenses or asset purchases are tax records too. The IRS ties how long to keep them to how long it can review a return:
- 3 years from filing, in the normal case.
- 3 years from filing or 2 years from paying the tax, whichever is later, if you claim a credit or refund after filing.
- 6 years if you leave out income that's more than 25% of the gross income shown on your return.
- 7 years if you claim a loss from worthless securities or a bad debt deduction.
- Indefinitely if you don't file a return, or file a fraudulent one.
- At least 4 years after the tax is due or paid, whichever is later, for employment tax records.
Records for property and equipment are kept until the period runs for the year you dispose of it, so the purchase contract for a truck you drive for eight years is needed for eight years plus the return's period. The IRS also points out that insurers and lenders may want records kept longer than it does.
Employment, lease and government contract records
| Record | Keep it for at least | Rule |
|---|---|---|
| Payroll records, and certain written agreements with employees, under the federal wage law | 3 years | 29 CFR 516.5 |
| Supplementary wage records such as time cards | 2 years | 29 CFR 516.6 |
| Personnel records under federal anti-discrimination rules | 1 year from the record or the personnel action, whichever is later | 29 CFR 1602.14 |
| Form I-9 | 3 years after hire or 1 year after employment ends, whichever is later | USCIS Handbook M-274 |
| Signed lead-based paint disclosures for housing built before 1978 | 3 years after the lease begins or the sale is completed | EPA |
| Records on a federal government contract | Generally 3 years after final payment, less for some record types | FAR 4.703 |
These are federal floors. State law can require more, and an employment contract or a lease is still a contract, so the limitation period above applies to it as well.
Electronic copies are enough
You don't need paper. Under the federal ESIGN Act, a legal duty to keep a contract is met by an electronic record that accurately reflects it and stays accessible to everyone entitled to it, in a form that can be accurately reproduced later (15 U.S.C. § 7001(d)). Section 12 of UETA, the state version, says the same, including for rules that ask for an original.
Two cautions. Keep the file exactly as it was signed, because re-saving it or printing and rescanning it loses the proof that it hasn't changed; how to store signed contracts covers the setup. And keep paper originals where the paper itself matters. A promissory note is the classic case: negotiable instruments fall under UCC Article 3, which ESIGN and UETA leave out, and the person enforcing one generally needs the signed original.
A simple retention schedule
| Document | A sensible minimum |
|---|---|
| Customer contracts, estimates and change orders | The contract's life plus your state's limitation period for written contracts |
| Construction job files | Through your state's statute of repose, which can run ten years or more after completion |
| Contracts that support a tax return | At least the IRS period for that return |
| Equipment and property purchase contracts | Until the IRS period ends for the year you sell or scrap it |
| Employment contracts and HR forms | The longest of the federal floors, your state's rules and the limitation period |
| Leases and lead disclosures | The lease term plus the limitation period; disclosures at least 3 years |
Before you shred anything, check whether a dispute is brewing. Once a lawsuit is threatened or likely, destroying related records can be held against you, so pause the schedule for anything connected to it.
Keeping signed contracts in SignMaster
When the last person signs, SignMaster emails every party the signed PDF with its certificate of completion: who signed, when, their email and IP address, and a SHA-256 fingerprint of each document that shows whether the file has changed since. The envelope stays in your account, and search matches envelope titles, so a consistent naming pattern makes old contracts easy to find. For a second copy, download signed PDFs in bulk, or on Crew and Company use a webhook to save each completed envelope to your own storage.
General information, not legal advice
Limitation periods have exceptions for when the clock starts, pauses or restarts, and they differ by state and by kind of claim. The periods above are examples from official sources, not a schedule for your business. Ask your lawyer or accountant to set one for your records.
Questions? Answers.
Is there one legal retention period for contracts?
No. No federal rule sets one period for all contracts. The working answer is the contract's term plus your state's limitation period for written contracts, extended by any tax, payroll or industry rule that applies.
Can I throw away the paper original after scanning it?
Usually, yes: ESIGN and UETA let an accurate, accessible electronic copy meet a duty to keep a record. Keep the paper where the original carries legal weight, such as a promissory note, a will, or a signature someone may claim was forged.
When does the limitation period start?
Generally when the claim accrues, which for a contract is usually the breach, such as a missed payment or defective work, not the signing date. For some claims the start is delayed until the problem is discovered, so count from the last date anything could have gone wrong.
How long should a landlord keep a lease?
For the lease term plus your state's limitation period for written contracts. For housing built before 1978, keep the signed lead-based paint disclosure at least 3 years from when the lease begins.
Sources
- IRS, How long should I keep records? · irs.gov
- Florida Statutes § 95.11, limitations other than for the recovery of real property · leg.state.fl.us
- N.Y. Civil Practice Law and Rules § 213, actions to be commenced within six years · nysenate.gov
- Ohio Revised Code § 2305.06, written contracts · codes.ohio.gov
- Ohio Revised Code § 1302.98, limitations on contracts for sale · codes.ohio.gov
- Ohio Revised Code § 2305.131, improvements to real property · codes.ohio.gov
- Revised Code of Washington 4.16.040, actions limited to six years · app.leg.wa.gov
- Revised Code of Washington 4.16.310, construction claims and substantial completion · app.leg.wa.gov
- Arizona Revised Statutes § 12-548, debts on written contracts · azleg.gov
- Rhode Island General Laws § 9-1-13, limitation of actions generally · webserver.rilegislature.gov
- 29 CFR Part 516, records to be kept by employers (eCFR) · ecfr.gov
- 29 CFR 1602.14, preservation of records (eCFR) · ecfr.gov
- USCIS Handbook for Employers M-274, 10.0 Retaining Form I-9 · uscis.gov
- EPA, Real estate disclosures about potential lead hazards · epa.gov
- Federal Acquisition Regulation 4.703, contractor records retention · acquisition.gov
- 15 U.S.C. § 7001, ESIGN Act general rule and consumer consent (govinfo) · govinfo.gov
- 15 U.S.C. § 7003, ESIGN Act exceptions (govinfo) · govinfo.gov
- Uniform Electronic Transactions Act (1999), final text (Uniform Law Commission) · uniformlaws.org
General information, not legal advice. Laws change, and how they apply depends on your situation. For advice about a specific document, talk to a lawyer licensed where you are.